2756. Chapter 2756
Chapter 2756
Haihan's layout in Jiande County is a long-term project. The preliminary infrastructure construction may last for several years, and the local stationing period of personnel sent from other places is often calculated in years. Considering this actual situation, the company located in Phoenix
The station at the foot of the mountain is not composed of tents or temporary shacks, but actually built several rows of uniform brick buildings as dormitories for the stationed personnel.
There are a canteen, clinic, headquarters, conference room, warehouse, armory, stables and other facilities. There are more than ten acres of land cultivated nearby outside the camp, where various fruits and vegetables are planted, and chickens, ducks, pigs and other livestock are also raised.
.
Although this place is a bit remote, the environment is good, with mountains and rivers, and the accommodation and supporting facilities are complete, so there is no need to worry about food and clothing. However, there are not many people stationed at the station at this time, and those who stay behind are basically those responsible for logistics affairs.
.
According to Huang Zhichang, most people are busy at various construction sites in Jiande County at this time. It will probably be in the evening when people from all walks of life return, and the camp will become more lively.
Bai Kesi did not spend too much time in this residence. He looked around roughly inside and out and got to know the living conditions here before embarking on the journey to the next stop.
Bai Kesi's next stop is the key project in Jiande County, which is the hydropower station construction site located in Zijintan, the upper reaches of the Xin'an River. This construction site is still about 20 miles away from Jiande County, so you still have to take a boat to get there.
.
On the way to the construction site, Huang Zhichang took the time to report the current project progress to Bai Kesi.
The preparatory work for this hydropower station actually started last summer. In the early stage, hundreds of engineering personnel were used to conduct topographic surveys and geological surveys of the upstream and downstream areas. Then, the Ministry of Construction and the Ministry of Industry will, based on the results of on-site surveys
Design the engineering plan and construction process of the hydropower station.
At the same time, a cement factory was built in a mountain depression by the river two miles away from the hydropower station dam site. There are no other products in Yanzhou, but there are limestone all over the mountains and plains, which provides the basis for many industrial projects to be settled there.
This solves a major problem in infrastructure. Otherwise, all the cement required for these projects would have to be imported from outside, and the freight alone would be an astronomical figure, not to mention the time lost.
Due to its simple production process, this cement plant has been put into production first. Although its production capacity is not large, it can basically meet the needs of the preliminary project of the hydropower station.
The infrastructure project of the hydropower station is still in the preparation stage. Only after all conditions are met can the dam and dam construction be started.
As the head of the Ministry of Industry, Baikes was of course also involved in the design of this hydropower station. According to what he knew, the entire construction period of this hydropower station is expected to be four years. After completion, the dam will have 15 hydropower units that will be put into operation to generate electricity.
If the problem of long-distance power transmission can be solved by then, the power generation capacity of this hydropower station will not only meet the production needs of various industrial projects in Yanzhou Prefecture, but also provide abundant power supply to Hangzhou Prefecture.
Although the prospects are promising, the process may not be smooth sailing. The construction scale and technical difficulty of this project have exceeded the several hydropower stations Haihan built on Hainan Island in the past. Moreover, those hydropower stations on Hainan Island were all built in sparsely populated areas.
, the impact on the surrounding living environment is not too great, but after the dam is built here to store water, it will have an impact on the neighboring counties around Qiandao Lake.
According to Huang Zhichang's information, there are more than ten villages and towns around Qiandao Lake that need to be relocated in the future, involving more than 10,000 people, and all of them require coordination and arrangements from the government.
In the afternoon of the same day, Baikes and his party arrived at Purple Gold Beach, and then began an on-the-spot investigation.
Under the leadership of Huang Zhichang, Bai Kesi and others climbed up to a hill by the river and observed the situation here from a high position.
Huang Zhichang said: "Sir, please see, the dam site we have selected is the junction between the Xin'an River and Qiandao Lake. To the north of the dam site is Qiandao Lake. After the water storage is completed, the water level of the lake will be higher than it is now.
Several feet, creating a gap for generating electricity.”
Qiandao Lake covers an area of 10,000 hectares. From where they are, they can actually only see a corner of the lake. However, the width of the connection between Qiandao Lake and Xin'an River is only a few tens of feet, and there are canyons made of solid rocks on both sides. For the construction of hydropower stations,
It is indeed an excellent natural dam site.
On the west bank of the dam site, there is an extremely busy construction site. Thousands of migrant workers are digging a diversion channel several feet wide and several miles long. The excavated stones are gathered on the spot and crushed with a stone crusher.
It can then be used as a building material to make concrete. The clay is loaded onto a horse-drawn carriage and transported to a cement factory not far away, where it is burned together with limestone to make cement.
Huang Zhichang said: "After the water diversion channel was built, the water from Qiandao Lake into the Xin'an River was diverted from it into the lower reaches, and then bamboo baskets were loaded with stones to block the original water channel, and then a hydropower station was built on the river channel.
Dam body. After the dam is completed, the water flow will be reintroduced into the dam body, and then the diversion channel will be sealed."
Huang Zhichang's introduction is very simple, but the actual construction process is not. Each link requires years and months of time and a huge investment of manpower, material and financial resources, and there is no mistake. Although cement, wood, stone and other building materials can be collected on site
However, steel materials, construction tools, processing equipment, and generator sets required for the later operation of hydropower stations, etc., still have to be transported from other places by shipping, and the demand for transportation capacity is still considerable.
Although Bai Letong had seen a hydropower station on Hainan Island and understood its operating principles, this was the first time he saw the construction process with his own eyes. After a moment, he had questions: "For such a large project, the daily consumption is
It’s not a small amount, and the cost is so high that I can’t even imagine it. I would like to ask, where did the construction funds come from?”
Huang Zhichang responded: "As far as I know, half of the funds required for this project are raised by the Donghai Region, and the other half is allocated by the executive committee. The investment from the start of the winter last year to the current stage has exceeded
It’s a million yuan.”
Bai Letong exclaimed: "The Donghai region is really rich, with a million dollars, it's really a big deal!"
Bai Kesi was thinking about it. When discussing with Shi Diwen a few days ago, he claimed that he would invest tens of millions of yuan in various projects this year. He didn't know how much of it would be invested here. According to the scale of the project and the construction process here, in the future,
The cost will only increase in the next few years. Presumably when the Donghai Region asks the Executive Committee for money next year, it will not be the same as this year.
Chapter completed!