Font
Large
Medium
Small
Night
Prev Index    Favorite Next

An apology to the renovation industry

Today, I read the post of the brother "Qingdeng Child" and felt deeply ashamed that I had not conducted any investigation in advance and wrote so many flaws.

Posts by Qingdeng’s brother:

Big, the decoration company is really making a fortune.

Advanced decoration companies sell technical services: early design, such as home intelligence, integrated fast installation systems, and relying on cheap to attract markets, it is very bad, because those who can afford houses in this market are still rich people, and those who can afford decoration companies are more part of it.

Some people complain that the decoration costs are expensive, but all the costs are not as good as the gross profit of a house above W, and the salary is not enough. The labor cost is amazing.

There are two people who know that if the decoration company does not maintain a construction team, it means that the monthly salary will not be paid. Because the decoration company generally has about 200 workers under it. If each person is calculated based on the market price, each mature worker is RMB 100 per day, then it is 3,000 per month. If the salary is paid only, the decoration company may lose 260W of labor wages in the off-season before May. Without the support of high profits, the peak season will not be seen. I think the author is not a person in the construction industry. All the people who build houses or decorate houses are not from their own company. There are also construction workers who switch to the decoration industry to improve their skills. Because the standards of carpenters and painters here are different.

Let’s talk about the calculation of project cost. For example, Mrs. Lu’s decoration method is no different from that of the road guerrillas. Generally, decoration companies have two calculation methods: 1\The material price quotation method, that is, manual and materials are reported in detail. Because such quotation often has errors during construction, the materials are settled according to actual settlement after completion. This quotation method has relatively complete requirements for the types and specifications of materials, so it is generally used in hypermarkets, that is, first estimate the price, and finally the owner goes to the store to save money and buy it. 2\The project quotation method. Basically, most decoration companies adopt this quotation method. For example, how much does it cost to make a door frame and how much does it cost to paint a flat paint.

In this novel, I really don't understand how to make a quote under the premise of lack of drawings? Without detailed area parameters, you can sign a contract by simply quoting the price? GG, the most important job designer in the decoration company missed it~ Also, do you know how much does it cost to ask a full-time employee to watch the only on-site supervisor? I'll give you a reference price in Shenzhen: a small two-bedroom house, the on-site supervision fee is 8,000 (two months construction period). I can't understand. If one person is watching a construction site, either this group of quality workers is incompetent to make a living, or the protagonist goes to work as a pants to supplement the construction site and gives a bonus of 50,000 yuan. If you don't steal the materials, you won't lose 3,000~5,000 yuan. I won't do this job, hahaha
Chapter completed!
Prev Index    Favorite Next