Font
Large
Medium
Small
Night
PrevPage Index    Favorite Next

Chapter 494: Plan Adjustment (seeking the month(2/2)

As for life, it's simpler. Just clear a stone beam nearby and build a temporary base!

I work in water conservancy, what kind of tent have I never lived in?"

"That's true!" Huang Wenyun nodded and sat down and stopped talking.

“The temporary road doesn’t need to be very wide, it just needs to be able to pass an excavator!

As for the oil required for the excavator, locals are also required to carry it!

This temporary road can be transformed into a sightseeing road after the water blocking dam is completed and people and machines are withdrawn.

Some environmental protection organizations in the province are fooling around!

Do you have any questions?" Yu Qingyang added another sentence before asking.

"there is none left!"

"No!"

"Since there is no such thing, then the Labor Department contacts the oil towns and cement factories and publishes recruitment information through them!

Time waits for no one, the excavator will start entering the mountain to open a road immediately!" Yu Qingyang decided with a wave of his hand.

"Mr. Yu, what should we do about the reservoir area outside the mountain?" Huang Wenyun thought of the construction problem of the artificial lake outside again.

"Reservoir area outside the mountains? Don't worry about it. When the rain stops in the mountains, the water outside will soon seep into the ground!

This is the Gobi Desert, a semi-sand soil that cannot hold water!" Yu Qingyang said with a smile.

The water overflowing from the mountains will soon seep into the ground and enter the underground water veins. Then it will be transported to the mountains through mysterious natural porters, and then emerge from the springs and flow into the barrier lake.

There is also a seepage zone below the barrier lake. The spring water flowing from the mountains and the seepage of the barrier lake form a perfect balance.

This is also the only time when there is heavy rain in the mountains, water will overflow and form a flash flood.

There is no need to adjust other construction plans. All that needs to be adjusted is the construction sequence.

The seminar ended and everyone went their separate ways.

Yu Qingyang left behind Zhang Zexian who had been silent all this time.

"What's going on? You can't bear such a small blow?"

"No, Mr. Yu, it was all my mistake, almost..."

"Now, it's useless for you to criticize me!

What you have to do is not to ask someone to criticize you, but to face the problem squarely, accept the lesson, and keep it in your heart.

Then cheer up, everyone in the project department is looking at you!

As a project manager, if you feel downcast and give up on yourself all day long, how can you let others work?

Not to mention that you will not change your mind even if Mount Tai collapses in front of you, you must also have a certain level of authority. You can yell at your subordinates, and you can face your subordinates with a smile every day, but you cannot face your subordinates with your head downcast!

To be a project manager, you don't necessarily have to be very skilled, but you must be able to keep your composure and be able to withstand pressure!" Yu Qingyang did not reprimand Zhang Zexian.

With such a big project weighing on Zhang Zexian, Yu Qingyang understood how much pressure he was under.
Chapter completed!
PrevPage Index    Favorite Next