Font
Large
Medium
Small
Night
PrevPage Index    Favorite Next

Chapter 493 Thrilling (two in one, seeking the moon)(2/2)

"It's okay. I think they are all very excited. When I made the inspection last night, it was very late and many graduates were still awake and discussing what they had seen during the day!"

"Well! If someone doesn't adapt, he can resign and go back to his country without having to work!

Just approve it!

Once we have gathered enough people, we will send them back home!

We must send someone to send them back to China and hand them over to the company's human resources department!" Yu Qingyang specifically explained.

This is not China. If you quit, I’ll give you a fare and leave!

This is Africa, so to speak, if they were allowed to leave the base on their own, they would not survive more than three days.

"Understand, we have always emphasized discipline, and no one is allowed to leave the base without permission!

I also made a special statement to the security company that no matter how many people go out, they will not be allowed to go without security guards accompanying them!"

"That's good, be careful and you won't make a big mistake! We brought them to Africa, and we have the responsibility and obligation to bring them back safely!

Come on, let’s go to the construction site and take a look!”

Construction of the artificial lake has begun.

The artificial lake is currently divided into two parts for construction.

One is to mechanically excavate an artificial lake and pile soil to build embankments.

The other is the valley river channel, which is a naturally formed valley.

During the rainy season, water flows out of the valley.

What is being done now is to reinforce the mountains on both sides of the valley.

Then we built a road all the way up the valley, and finally arrived at the barrier lake, where we built a new dam under the barrier lake.

Install a water release gate on the dam.

Finally, the barrier lake was blown up, so that firstly, the safety of the construction below could be ensured, and secondly, the size of the water flow could be adjusted according to needs.

Having water all year round can ensure the needs of hydropower generation.

According to measurement data from the design institute, this barrier lake has a water storage capacity of more than 20 billion cubic meters.

A reservoir with such a large water storage capacity is considered very large even in China.

It is as big as three Danjiangkou reservoirs.

It can be seen that Africa does not really have no water, it is just that they cannot find water or are not good at using it.

There are abundant water sources hidden under the Sahara Desert. The underground river, the eighth wonder of the world, that Lao Ka wants to build is to divert water from the Sahara Desert to the north and solve the problem of water shortage in the north.

What Yu Qingyang and the others have to do now is to lure out the huge body of water hidden in the mountains.

“When you are constructing, you must pay attention to safety!

It may be sunny outside, but it may be stormy in the mountains.

Therefore, strengthening the mountain is not the most important task!

Going up the mountain first and building the dam is the key!" When Yu Qingyang saw the busy workers in the valley, the smile on his face disappeared immediately.

Yu Qingyang did not participate in the review of the previous construction plan.

If you participate in the review, you will definitely not agree to them strengthening the mountains on both sides of the valley first.

A group of people are reinforcing the mountain in the valley. If it rains in the mountains and the water overflows the dam of the barrier lake, it will be a flash flood.

No one in the valley can escape.

"Mr. Yu, we consulted the nearby tribes and found that there has been no water flowing out for several years!" Zhang Zexian explained.

"You must have never gone into the mountain to inspect it. You just made the construction plan based on the drawings and the oral statements of nearby residents?" Yu Qingyang asked seriously.

"The mountain road is difficult to walk, so we plan to build it all the way up so that concrete and other construction materials can be transported in!"

“The idea is good, but the safety risks are too great!

Let the people in the valley evacuate first!

Sun Jian, call and ask Xu Yanhua to send a helicopter over!" Yu Qing didn't have time to explain to Zhang Zexian, so he ordered directly.

No matter how many explanations there are, it would be more convincing to take them into the mountains to have a look on the ground.

Yu Qingyang's face was so gloomy and frightening that Zhang Zexian did not dare to refute, so he quickly took orders and informed the people in the valley to evacuate.

More than an hour later, a helicopter appeared in the sky.

Because there were many dangers hidden in the mountains, Yu Qingyang's security team had to accompany him, so he only called Zhang Zexian, chief engineer Huang Wenyun, construction director Li Zengshu, and technical director Wang Xiaomin.

A group of eleven people took a helicopter and entered the mountain.

This is much more comfortable than Yu Qingyang's first time in the mountains.

The plane had just flown along the valley and into the mountains. Not far away, it heard a loud thunderous noise from below.

Looking through the glass of the helicopter, Zhang Zexian's face turned pale! His mind went blank!

A turbid water flow carried rocks in the valley.

Yu Qingyang looked out the window and broke into a cold sweat.

Just now, if I was like Zhang Zexian, I was lucky and didn't stop and let people evacuate the valley.

No one in the valley will survive.

"Hey, hello! I'm Yu Qingyang!

Order all machinery and equipment and personnel to evacuate to high ground immediately!

Repeat, evacuate to higher ground immediately!

The flash flood is coming!

Repeat, the flash flood is coming!
Chapter completed!
PrevPage Index    Favorite Next